Green Button Go Scheduler Extension
Multipath Scheduler
Schedule and control multiple robots and transport systems simultaneously
Lab Transportation Extraordinaire
With the Multipath Scheduler extension for Green Button Go Scheduler, you gain advanced controls for transporting samples through the lab. Multipath Scheduler plots trajectories for each sample plate and identifies the optimal path free of traffic jams.
- Transport samples between instruments
- Automatically find optimal transport path
- Manage various assays
- Utilize a variety of transport methods
- Control multiple robotic arms simultaneously and in coordination
See it in action
Multipath Scheduler is
Efficient
Easy to use
Scalable
Interested in what Scheduler with Multipath Scheduler can do for your lab?
The Art of Robotic Movement
Multipath Scheduler extends Green Button Go Scheduler to control transportation systems of all sizes, ranging from small lab setups to complex enterprise-level biofactories.
Maximize efficiency
Define optimal routes for movement of materials around platform based upon multiple sample and instrument access strategies
Track samples during movement
Track samples in the lab across different transportation mechanisms to avoid bottlenecks and deadlocks
Integrate all types of transportation systems
Program transportation mechanisms of multiple transport systems such as mobile robots, robotic arms, and track-based conveyors to work simultaneously or incoordination